Tag Archives: 6-10 Connector

Notre Dame’s 6-10 charrette

Here are the boards – images reflecting thoughts thus far – of the charrette or brainstorming session on the 6-10 connector and Route 195 land issues, hosted last month by Prof. Philip Bess and his graduate students from the School … Continue reading

Posted in Architecture, Urbanism and planning | Tagged , , , , , | Leave a comment

Build the boulevard anyway

Governor Raimondo has stepped into the debate here in Providence over how to rebuild the aging 6-10 Connector, which carries traffic into downtown from parts west. The state originally wanted to build a complex version of Boston’s Big Dig, but … Continue reading

Posted in Providence, Urbanism and planning | Tagged , , , , , , , , , , | 6 Comments

A job for new bridge group

The Providence Journal reports that a new organization, Building Bridges Providence, has been formed to push for progress on the long-delayed pedestrian bridge to connect the I-195 development land and its two parks on either side of the Providence River. … Continue reading

Posted in Architects, Architecture, Architecture Education, Architecture History, Art and design, I-195 Redevelopment District, Preservation, Providence, Providence Journal, Rhode Island, Urbanism and planning | Tagged , , , , , , , | 2 Comments

Big Dig redux in Prov?

My impression of the proposed 6-10 connector alternative to rebuilding the aging highway was to replace the highway with a surface boulevard – a concept I cheered last December in “A boulevard, not a highway.” Imagine my surprise reading in … Continue reading

Posted in Architecture, Development, Landscape Architecture, Providence, Rhode Island, Urbanism and planning | Tagged , , , , , , | 8 Comments